Jaar
2026
Auteur
Dye, Bass
Peck, Myron A.
van de Wolfshaar, Karen E.
van Leeuwen, Anieke
Bron
Conservation Physiology 14 (2026) 1
Disentangling the effects of resource level and temperature dependence on the performance of fish in different guilds
Jaar
2026
Auteur
Dye, Bass
Peck, Myron A.
van de Wolfshaar, Karen E.
van Leeuwen, Anieke
Bron
Conservation Physiology 14 (2026) 1
Samenvatting
Bekijk PDF